Home
|
About
|
Blog
|
Contact us
|
News
|
Links
[
Log On or Register
]
Toggle navigation
Publications
Software
Equipment
SEARCH
Your single point of reference for all your Geotechnical Inquiries
Error Messages go here
Publications
Codes and Standards
Dam Engineering
Dam Analysis & Design
Dam Construction
Dam Ground Improvement
Dam Ground Investigation
Dam Management
Dam Monitoring
Dam Numerical Analysis
Dam Rehabilitation
Dam Risk Assessment
Dam Seismic Design
Environmental Implications
Materials for Dams
Seepage and Groundwater Control
Earthquake Engineering
Engineering Geology
Environmental Geoengineering
Geology
Geotechnical Professional Practice
Management & Scheduling
Mining Engineering
Pavement
Rock Mechanics
Soil Mechanics
Statistics & Reliability
Tunnel Engineering
Publications in
Dam Construction
Total Items found:
18
CONSTRUCTION OF COFFERDAM -A CASE STUDY (2014)
Santhosh H.P.
,
Dr. Rajashekhara Swamy H.M.
et al.
<p>This paper presents an overview of the present state of construction of cofferdam techniques with special emphasis and a brief on other techniques developed world over for mitigating hydraulic forces on the temporary structures. A cofferdam is a temporary ...
Filed under:
Dam Engineering
-
Dam Construction
Reference:
IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) e-ISSN: 2278-1684, p-ISSN: 2320-334X PP 45-50
INVESTIGATING THE POSSIBILITY OF CONSTRUCTING LOW COST ROLLER COMPACTED CONCRETE DAM (2014)
Abu-Khashaba M. I.
,
Adam I.
et al.
<p>This research was set with the objective of investigating the possibility of constructing Roller Compacted-Concrete Dam, RCCD, using local material to reduce its cost. Trial laboratory concrete mixtures were conducted to define RCCD proportions in stage-I. ...
Filed under:
Dam Engineering
-
Dam Construction
Reference:
Alexandria Engineering Journal (2014) 53, 131–142
FILTERS FOR EMBANKMENT DAMS BEST PRACTICES FOR DESIGN AND CONSTRUCTION (2011)
<p>Filters in embankment dams are composed of specifically-designed entities (zones) of coarser-grained soils placed at specifically-targeted locations within or adjacent to the dam structure. Filters are designed and constructed to achieve specific goals ...
Filed under:
Dam Engineering
-
Dam Construction
Reference:
FEMA October 2011
NAM NGUM 2 CFRD - BEHAVIOUR DURING CONSTRUCTION AND FIRST IMPOUNDING (2011)
Moll S.
,
Straubhaar R.
The 182 m high concrete face rockfill dam (CFRD) is one of the main components of the Nam Ngum 2 (NN2) hydropower scheme in Lao PDR. Construction of the dam was essentially completed in March 2010 and reservoir impounding commenced subsequently. This paper ...
Filed under:
Dam Engineering
-
Dam Construction
Reference:
6TH INTERNATIONAL CONFERENCE ON DAM ENGINEERING, C.Pina, E.Portela, J.Gomes (ed.), Lisbon, Portugal, February 15-17, 2011
ROLLER COMPACTED CONCRETE (2011)
RCC is batched and mixed onsite using a portable mixing plant. Occasionally, one or more aggregates are obtained on or near the site and graded to conform to the specified aggregate gradation. It is more common to purchase aggregates from an aggregate supplier ...
Filed under:
Dam Engineering
-
Dam Construction
Reference:
Part 645 Construction Inspection National Engineering Handbook
ROLLER COMPACTED CONCRETE: A LITRATURE REVIEW (2009)
Bauchkar S. D.
,
Chore H. S.
<p>The development of the roller-compacted concrete (RCC) technology in the 1980s is considered by many as a significant breakthrough in the construction industry. RCC is now commonly used all around the world for the construction of dams and pavements, and ...
Filed under:
Dam Engineering
-
Dam Construction
Reference:
Second International Conference on Emerging Trends in Engineering (SICETE)
GROUTING ON THE KÁRAHNJÚKAR HYDROELECTRIC PROJECT’S TUNNELS (2008)
Chittenden N.
This paper discusses some of the problems encountered with water ingress on the 72km of tunnels on this project. Grouting is always a significant portion of dam projects and with the quantities of water expected in the tunnels, was also going to be an important ...
Filed under:
Dam Engineering
-
Dam Construction
Reference:
6 th International Symposium on Ground Support in Mining and Civil Engineering Construction
GUIDELINES FOR THE CONSTRUCTION OF EARTH-FILL DAMS (2008)
Harradine A.
<p>The Guidelines for the Construction of Earth-Fill Dams detail the specifications for the construction of earth-fill dams, and outline the precautions and methods which should be employed in order to obtain the soundest possible structure. These guidelines ...
Filed under:
Dam Engineering
-
Dam Construction
Reference:
Tasmania Department of Primary Industries and Water, Water Resources Policy Policy
NUMERICAL MODELING OF CONCRETE FACE ROCKFILL DAM AT SEISMIC IMPACT (2008)
Glagovsky V. B.
,
Kourneva E. V.
Many high concrete face rockfill dams (CFRD) have been built in different countries. Russian engineers have been studying the world experience of CFRD design and possibility CFRD construction in the high seismicity regions of Russia. The report considers the ...
Filed under:
Dam Engineering
-
Dam Construction
Reference:
The 14th World Conference on Earthquake Engineering October 12-17, 2008, Beijing, China
ROLLER-COMPACTED CONCRETE FOR DAM SAFETY MODIFICATIONS (2008)
Dolen T. P.
,
Abdo F. Y.
<p>Roller-compacted concrete (RCC) is used throughout the world for new dam construction. In the United States, RCC is also used extensively for modifying dams with safety deficiencies including stability buttresses for concrete dams, overtopping protection ...
Filed under:
Dam Engineering
-
Dam Construction
Reference:
ANAIS DO 50º CONGRESSO BRASILEIRO DO CONCRETO - CBC2008
This site uses cookies. Read about our
Cookie Policy
I understand.